China's Premium Asphalt Plant Manufacturer | D&G Machinery Stock Code 1301.HK | Completely Road Construction Solutions Provider, Pursuing Excellence

What should be done after the burner is electrified before the first ignition?

Update Time:2023/8/21
Asphalt mixing plants burners D&G Machinery

Check whether the oil pipe and air pipe are connected correctly; wiring,the position of the lance,the position of the guard plate,the position of the IPC pilot,the position of the fotocell,the position of the gate。Check the servo system and air sytem,check the Motor running direction.